Difference: CDChartDirectorDesignerAPI (28 vs. 29)

Revision 292010-04-07 - SteveFrizzell

Line: 1 to 1
 

Chart Director API for APPX

This API can be used by an APPX designer to create business charts within an APPX application.

Line: 144 to 144
 
.PIE SECT INITIALIZE

Initialize a specific pie sector spec.

Changed:
<
<
.PIE SECT ADD NEW
>
>
.PIE SECT ADD NEXT
 
Changed:
<
<
Add a new sector spec for the pie chart and optionally sets the Label.
>
>
Add a next pie chart sector spec for the "current" pie chart and optionally sets the corresponding data value and the corresponding Label.
 
.PIE SECT SET CURRENT

Set the "current" pie chart sector to be a previously initialized pie sector of the "current" chart.

 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2024 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback