Line: 1 to 1 | ||||||||
---|---|---|---|---|---|---|---|---|
.AXIS SYNC Y AXIS |
Line: 1 to 1 | ||||||||
---|---|---|---|---|---|---|---|---|
Added: | ||||||||
> > |
.AXIS SYNC Y AXISThis subroutine sets a linear formula to synchronize the secondary y-axis scale to the primary y-axis scale.Usage:PASS <slope> FIELD SHARE? N PASS <intercept> FIELD SHARE? N GOSUB 0CD .AXIS SYNC Y AXIS * Check for error IF 0CD .AXIS SYNC Y AXIS NE Description:This subroutine sets a linear formula to synchronize the secondary y-axis scale to the primary y-axis scale. This is usually used if the two y-axes represent the same measurement using different units. Examples including temperature in Celsius and in Fahrenheit, and length in meters and feet.The formula is : y2 = y1 * slope + intercept
Both parameters are optional, and if not received, <slope> defaults to 1 and <intercept> default to zero. To "un-synchronize" the 2 axes, pass a blank for <slope>. If neither parameter is received, this will simply duplicate the scale on both the primary and secondary axes.
Comments:Read what other users have said about this page or add your own comments.-- JeanNeron - 2011-12-12 |