Chapter 4-7: Predefined Fields and Processes
PRINT SPOOL DATE
This field contains the value of the Spool Date option, which can optionally be entered when the input process DISPOSITION is run. If supported by the operating system, PRINT SPOOL DATE can cause a spooled report to delay being printed until a specified date and time.
SET --- PRINT SPOOL DATE = TAP WORK DATE
APPX Application
Design Manual (01/13/03)
© 2003 by APPX Software, Inc. All rights reserved