Chapter 4-7: Predefined Fields and Processes
LOG SPOOL DATE
This field contains the value of the Spool Date option, which can optionally be entered when the input process DISPOSITION is run. If supported by the operating system, LOG SPOOL DATE can cause a spooled log to delay being printed until a specified date and time.
SET --- LOG SPOOL DATE = TAP WORK DATE
APPX Application Design Manual (01/13/03)
© 2003 by APPX Software, Inc. All rights reserved